Installation Of Hybrid Solar Power Systems Tender Notice
Description
Installation of off-grid hybrid solar power systems comprising 19 units of 4 KW each at headquarters, subdivision courts and allied offices in District Khushab. Procurement shall be conducted through Single Stage Two Envelope bidding procedure under Punjab Procurement Rules 2014. Contractors registered with Pakistan Engineering Council in the relevant category may participate through the Punjab e-procurement portal. Bid security in the form of CDR equal to 5 percent of the estimated cost is mandatory and the original must be submitted before technical bid opening. Technical proposals will be opened first and financial proposals of technically qualified bidders will be opened later. Pro Tip: The project includes solar energy systems, photovoltaic installations, hybrid solar power solutions, renewable energy infrastructure, off-grid power generation, solar panels, inverters and electrical installation works.
Organization Contact
Tags
power, electrical
Keywords Used for Search
hybrid solar power systemsClosing Date: 04 Jul 2026
Similar Tenders
Installation of Off Grid Hybrid Solar Power Systems
Installation of off-grid hybrid solar power system comprising 19 units of 4 KW each at Head Quarter Jauharabad and Sub Division Courts Quaidabad and Noorpur Tha...
Khushab
Punjab
Saturday 04 Jul 2026
IPL-6195
Procurement and Installation of Hybrid Solar Power System
Procurement supply installation testing and commissioning of a 4 KW hybrid solar power system including tier 1 solar panels hybrid inverter mounting structure c...
Attock
Punjab
Monday 29 Jun 2026
TENDER NOTICE-17/2025-2026
Installation of Hybrid Solar Power Systems
Installation of Hybrid Solar Off Grid 4KW systems. Procurement shall be conducted through EPADS under Single Stage Two Envelope procedure in accordance with PPR...
Toba Tek Singh
Punjab
Tuesday 30 Jun 2026
Installation of Hybrid Off Grid Solar Systems
Installation of Hybrid Solarization 04KW Off Grid systems at Headquarter Chakwal, Sub Division Talagang and Choa Saiden Shah comprising 27 solar systems. Procur...
Chakwal
Punjab
Monday 29 Jun 2026
Installation of Hybrid Solar Power System
Installation of 19 off grid hybrid solar power system units of 4 KW each at Head Quarter Jauharabad and Sub Division Courts Quaidabad and Noorpur Thal along wit...
Khushab
Punjab
Saturday 04 Jul 2026
NOT_PROVIDED
Procurement and Installation of Hybrid Solar Systems
Procurement and installation of two 5kW hybrid solar systems under college funds. Bidding shall be conducted through Single Stage Single Envelope procedure. Eli...
Swabi
KPK
Monday 29 Jun 2026