Road Network Construction For Economic Zone Connectivity Tender Notice
Description
Construction of road network connectivity between Bostan Special Economic Zone and Bostan Railway Station under Balochistan Public Procurement Rules 2014 through Single Stage Two Envelope procedure based on composite schedule rates 2023 on percentage rates. Eligible bidders with PEC category C-2 and above having specialization code CE01(i) for roads pavements drainage and retaining structures may participate. Bidders must have completed at least two road construction assignments costing minimum PKR 350 million each and two building works costing minimum PKR 400 million each during last three years. Tender fee and 3% call deposit receipt from scheduled bank are mandatory. Electronic bids shall be submitted through supplier dashboard and opened on EPPS system. Pro Tip Short Paragraph: Infrastructure contractors should prepare evidence of major road and building projects, valid PEC credentials and financial capability documentation before submission.
Organization Contact
Tags
construction, road
Keywords Used for Search
road network construction economic zone connectivityClosing Date: 26 May 2026
Similar Tenders
Rehabilitation and Reconstruction of Multiple Road Works
Rehabilitation improvement widening and reconstruction of multiple road works including - carpet road from 24 JB Lahorian to 21 JB Raniki - road from 24 JB Laho...
Faisalabad
Punjab
Wednesday 20 May 2026
NOT_PROVIDED
Road Network Connectivity Infrastructure Project
Construction work for connecting Bostan Special Economic Zone with Bostan Railway Station through road network under Balochistan Public Procurement Rules 2014 t...
Quetta
Balochistan
Tuesday 26 May 2026
TSE-2526051046773
Road Rehabilitation Improvement and Construction Works
Procurement of road rehabilitation improvement widening and construction works in District Sahiwal including rehabilitation improvement of roads from GGHSS 45/1...
Sahiwal
Punjab
Tuesday 02 Jun 2026
5723
Construction Rehabilitation and Safety Improvement Works
Construction rehabilitation and improvement works for multiple urban infrastructure schemes in Lahore including missing links and rehabilitation of roads in dif...
Lahore
Punjab
Friday 22 May 2026
NOT_PROVIDED
Procurement Internet Connectivity and Network Services Framework Contract
Framework contract for procurement of multi protocol label switching and internet connectivity services for health information and service delivery unit under E...
Lahore
Punjab
Monday 18 May 2026
HISDU(H&PD)/PROC/7-09/2025-26&2026-27
Procurement of MPLS and Internet Connectivity Services
Framework contract for procurement of Multi-Protocol Label Switching and internet connectivity services for Health Information and Service Delivery Unit under H...
Lahore
Punjab
Monday 25 May 2026
HISDU(H&PD)/PROC/7-08/2025-26 & 2026-27