Construction Rehabilitation And Safety Improvement Works Tender Notice
Description
Construction rehabilitation and improvement works for multiple urban infrastructure schemes in Lahore including missing links and rehabilitation of roads in different schemes - urban regeneration of southern bypass Thokar Junction and Shah Alam Road corridors - installation of signage boards on major and adjoining roads of Township Scheme - provision of safety railing along Akbar Chowk Flyover - rehabilitation and improvement of Satokatla Drain Crossing Bridge - development of road infrastructure in H-Block LDA Avenue-I Zone-II and Zone-III - improvement of road furniture and traffic safety measures around Butcher Khana Distributory - rehabilitation of roads in F-Block Jubilee Town - revitalization works at Ferozpur Road from Shanghai Bridge to Lahore Bridge - rehabilitation and construction of service road from Shaukat Khanum Flyover to Allah Hoo Chowk - installation of high mast poles with lighting arrangements and informatory gantries at various locations - rehabilitation and improvement of Hudiara Drain Road and construction of pedestrian bridge at Gajju Matah. Procurement will be conducted through Single Stage Two Envelope Procedure under PPRA Rules 2014 through EPADS. Contractors must possess valid PEC licenses in relevant categories with active NTN and PNTN registration. Technical and financial proposals are required electronically through PDF upload on EPADS and original bid security equal to 5% of estimated cost in shape of bank guarantee bank draft pay order or call deposit receipt must be submitted before submission deadline. Conditional bids corrupted unreadable or virus infected e-bids shall be rejected. Pro Tip Short Paragraph: Civil engineering contractors specializing in urban road infrastructure bridges traffic management and rehabilitation projects should ensure complete EPADS registration and strict compliance with technical evaluation and bid security requirements.
Organization Contact
Tags
construction, road
Keywords Used for Search
construction rehabilitation safety improvementClosing Date: 22 May 2026
Similar Tenders
Provision of Water Supply and Sanitation Works in Hazara and Southern Districts Phase I
Execution of development works under ADP Scheme No. 240244 Provision of Water Supply and Sanitation in Hazara and Southern Districts of Khyber Pakhtunkhwa Phase...
Dera Ismail Khan
Khyber Pakhtunkhwa
Monday 25 May 2026
NOT_PROVIDED
Solarization rehabilitation and beautification works multiple schemes District Karak
Electronic bids invited through EPADS under single stage two envelope procedure for Solarization of Tube wells in Khyber Pakhtunkhwa ADP No 240245 including Sol...
Karak
Khyber Pakhtunkhwa
Monday 18 May 2026
INF(P)1956/26
Construction and Rehabilitation of Roads and Public Facilities
Construction and rehabilitation works including - Construction of Public Safety Complex Boota Bhatiot Road - Rehabilitation of road and culvert at Dhoke Mond Te...
Attock
Punjab
Monday 25 May 2026
197/MO(I)MC/Rwp
Rehabilitation and Improvement Civil Works
Rehabilitation and improvement civil works including rehabilitation and improvement of residential flats remaining work behind MCR building rehabilitation of st...
Rawalpindi
Punjab
Monday 01 Jun 2026
TS.181-MOI-MCR
Accelerated Sustainable Development Initiative Works in Kolai Pallas Kohistan
Execution of development works under Accelerated Sustainable Development Initiative ADP 251282 through Single Stage Single Envelope Procedure via EPADS. Works i...
Kolai Pallas Kohistan
Khyber Pakhtunkhwa
Wednesday 20 May 2026
NOT_PROVIDED
Construction Improvement Metalling Black Topping Roads
Remaining work construction, improvement, metalling and black topping of multiple roads and link roads in District Neelum under Single Stage Single Envelope E-B...
Neelum
Azad Jammu and Kashmir
Thursday 04 Jun 2026
932/DB/CE