Illumination Of Main Boulevard Road Corridor Tender Notice
Description
Construction and illumination works for Main Boulevard from Ring Road Roundabout to Butcher Khana Canal Road Lahore. Procurement shall be conducted through EPADS under PPRA Rule 38(2)(a) Single Stage Two Envelope procedure. Eligible engineering firms and contractors having valid PEC License in Category G-4 and above and relevant specialization codes may participate. Estimated project cost is PKR 190,177,076 with completion period of 3 months. Bid security equal to 5 percent of estimated cost amounting to PKR 9,508,854 is required in the form of bank guarantee, bank draft, pay order or call deposit receipt in favour of Lahore Development Authority. Technical and financial proposals must be submitted separately through EPADS and original bid security must be submitted before bid closing time. Financial bids of technically responsive bidders shall be opened after technical evaluation. Pro Tip: This procurement includes road illumination works, boulevard lighting systems, solar LED lighting infrastructure, electrical engineering works, urban lighting development, energy efficient street lighting and roadway illumination installation for public infrastructure enhancement.
Organization Contact
Tags
electrical, construction, power
Keywords Used for Search
illumination main boulevard road corridorClosing Date: 08 Jul 2026
Similar Tenders
Building and Pedestrian Bridge Maintenance Works
Execute repair and maintenance works including pedestrian bridge near Airline Society Khayaban-e-Jinnah Road Lahore, Chief Engineer-I Cell corridor and washroom...
Lahore
Punjab
Friday 03 Jul 2026
PPRA-38-1
Architectural Illumination of Government Buildings
Architectural illumination works for National Assembly Aiwan-e-Sadr Prime Minister Secretariat and Supreme Court of Pakistan buildings located on Constitution A...
Islamabad
Islamabad
Monday 29 Jun 2026
PID(I)9920/25
Prequalification of Construction Firms for Development Projects
Applications are invited for prequalification of PEC registered firms and contractors for construction of villas, TAJ Suites G+3 buildings, TAJ Boulevard Tower ...
Islamabad
Islamabad
Monday 06 Jul 2026
NOT_PROVIDED
Road Repair and Maintenance Works
Repair and maintenance works including repair and maintenance of link connecting Khayaban-e-Jinnah Lahore, repair and improvement of road including road safety ...
Lahore
Punjab
Thursday 09 Jul 2026
NOT_PROVIDED
Road Network Feasibility and Detailed Design Consultancy
Consultancy services for feasibility study, techno economic feasibility and detailed design for upgradation of road network in Gilgit Baltistan to promote touri...
Islamabad
Islamabad
Tuesday 30 Jun 2026
6(681)
Road and Service Road Maintenance Works
Execute repair and maintenance works including Madar-e-Millat Road from Pindi Stop to Hamdard Chowk Township Lahore and service road in Block A New Muslim Town ...
Lahore
Punjab
Monday 06 Jul 2026
PPRA-38-1